Projects

LA 3241: LA 435 to LA 40/LA 41

IMG_1815

New 4 Lane highway project in St. Tammany Parish, Louisiana.
Our scopes of work consisted of Drainage, Embankment, Rip Rap, and Structural Concrete.

LA 190/ LA 22 Improvements

IMG_3396

Road widening project in St. Tammany Parish, Louisiana.
Our scopes of work consisted of Removal of Existing Structures, Drainage, Excavation, Non- Plastic Embankment, and Embankment.

LA 70: Sunshine Bridge – LA 22

IMG_0278

New 4 Lane Highway Project in St. James and Ascension Parishes, Louisiana.
Our scopes of work consisted of Removal of Existing Structures, Drainage, Box Culverts, Structural Concrete, and Rip Rap.

I-10 & Pecue Lane Interchange Phase III

IMG_1166

Road widening project in East Baton Rouge Parish, Louisiana.
Our scopes of work consisted of Removal of Existing Structures, Drainage, Box Culverts, Structural Concrete, and Rip Rap.

Comite River Diversion Bridge

IMG_0833 (Copy)

Diversion canal and Bridge construction part of the of the Comite River Diversion project in East Baton Rouge Parish. Ous scopes work conceited of of Drainage Structures and R-90 Rip Rap installation.